MJF Specialist Flooring was appointed to undertake a resin flooring refurbishment at a leading hotel in Glasgow. The project involved the installation of approximately 140m² of Flowcrete Flowfast Quartz Structure, a 2mm MMA resin flooring system, applied directly over the existing resin flooring. As part of our comprehensive package, MJF also coordinated the removal and reinstatement of the kitchen equipment, ensuring all associated works were managed efficiently and in line with the installation programme. The project required careful planning and coordination to deliver a high-quality flooring solution while allowing the hotel to continue its normal day-to-day operations.
Spotlight on the Project
The installation focused on refurbishing the existing kitchen flooring to enhance its appearance and improve its slip-resistant properties.
Rather than undertaking a complete removal of the existing resin floor, the decision was made to overcoat the existing surface with Flowcrete's Flowfast Quartz Structure MMA system. This provided an effective refurbishment solution, renewing the floor finish while minimising the extent of disruption associated with a full flooring replacement.
The 2mm quartz-structured finish provided a durable, practical surface suited to the demands of a busy commercial kitchen environment.


Challenges and Solutions
One of the main challenges was completing the refurbishment while the hotel remained fully operational. With guests continuing to stay at the hotel and the wider facilities remaining open, it was essential that our works had minimal impact on the hotel's day-to-day activities.
To overcome this, MJF organised the installation around night shifts, allowing the team to carry out the majority of the work outside peak operating hours. The project was also carefully divided into phases, ensuring individual areas could be completed progressively while maintaining access and minimising disruption wherever possible.
Working within an occupied hotel meant particular consideration had to be given to noise levels, especially during the preparation stages of the flooring installation.
Our team carefully planned the works and coordinated activities to keep noise to a minimum, taking into account the hotel's guests and operational requirements. Effective communication and a flexible working programme were essential in ensuring the project progressed without unnecessary disturbance.
The removal and reinstatement of kitchen equipment presented an additional logistical consideration. By incorporating this into our overall package, MJF was able to coordinate the associated works alongside the flooring installation, helping to streamline the programme and ensure the kitchen could be reinstated following completion.
Project Outcomes
MJF successfully delivered the 140m² resin flooring refurbishment using Flowcrete's 2mm Flowfast Quartz Structure MMA system, providing the kitchen with a refreshed, durable and slip-resistant floor finish.
Through careful planning, phased working and night-shift installation, we were able to complete the project while the hotel continued trading as usual, keeping disruption to guests and hotel operations to a minimum.
By coordinating both the specialist flooring installation and kitchen equipment removal and reinstatement, MJF delivered a comprehensive refurbishment package, demonstrating our ability to manage complex works within busy commercial hospitality environments.
"Projects within busy hospitality environments require careful planning, flexibility and effective coordination to ensure disruption is kept to a minimum. This project demonstrates how we can deliver a complete flooring refurbishment package, managing everything from the flooring installation through to the removal and reinstatement of kitchen equipment. By working closely with the client and adapting our programme around their operational requirements, we were able to deliver a durable, slip-resistant flooring solution without impacting the hotel's day-to-day operations."
Sales Manager | MJF Specialist Flooring